  • ENEL, Torrevaldaliga Nord Power Plant, Civitavecchia, Rome, Italy (via Sandvik Austria); Training Documentation (Language : Italian) and Site Training on the Bulk Handling System; (Completed) (Year 2009)
  • ENEL, Torrevaldaliga Nord Power Plant, Civitavecchia, Rome, Italy (via Sandvik Austria); Commissioning & Trouble Shooting of the Bulk Handling System; (Completed) (Year 2009-2010)
  • BELCHATOW Lignite Power Plant, Poland (via Sandvik Germany & Poland); Training Documentation and Site Training on the Material Handling System; (Completed) (Year 2010)
  • STUDIO SANTI, Santa Marinella, Italy; Engineering and Design of the Material Handling System (Coal) of Torrevaldaliga Sud, Rome, Italy ; (Completed) (Year 2010-2011)
  • STUDIO SANTI, Santa Marinella, Italy; Engineering and Design of the Material Handling System (Coal) of Tirreno Power Plant Vado Ligure, Italy; (Completed) (Year 2011)
  • JIMAH Power Plant (via ThyssenKrupp Germany); Rectification and Warranty Clearance for the Stacker/Reclaimer; (Completed) (Year Oct 2010)
  • PORT TARRAGONA, Spain (via Sandvik Italia SPA); Assessment of Columbian Steam Coal Quality at the Transhipment Facility for ENEL Torrevaldaliga Nord; (Completed) (Year 2010)
  • TANJUNG BIN Power Plant; Boom Hinge Replacement No 6 & 7; (Completed) (Year Feb 2011)
  • TANJUNG BIN Power Plant; Realignment/Rectification of the Rotary Feeders at the Continuous Ship Unloaders;(Completed)
  • ENERGY DEPT MINISTRY Malaysia, Technical Study for Coal Fired Power Plant, (via Energy Consultancy ILC); (Completed) (Year April 2011)
  • LCS Optiroc Pte Ltd, Singapore (via Seven Star Hills); Design, Engineering, Fabrication & Installation of a complete new crusher for Sand; (Completed)
  • JIMAH Power Plant (via ThyssenKrupp Germany); Replacement/Repair Hydraulic Cylinder for Stacker/Reclaimers; (Completed) (Year April 2011)
  • TNB JANAMANJUNG Extension (via Mutiara Etnik Sdn Bhd); Preparation of Training Modules and Review of Operation and Maintenance Modules; (Completed) (Year Nov 2012)
  • TNB JANAMANJUNG (Via IPSM), Commissioning Assistance for the Extension of Manjung Coal Stockyard Project (Completed) (Year Oct 2013)
  • TNB JANA-MANJUNG IV (via Mutiara Etnik Sdn Bhd); Training for the Extension of Existing Coal Stockyard (Completed) (Year Nov 2013)
  • JORDAN Shale Oil Project (via YTL Power): Project Study for O&M of the Shale Oil Project in Jordan; (Completed) (Year Aug 2013)
  • 3B PROJECT MALAYSIA (via YTL Power) : Technical Studies for 3B Project for YTL; (Completed) (Year Aug 2013)
  • ANN JOO STEEL BHD (via Domestic Maju) : Provision of Training on MHS and Improvement Studies; (Completed) (Year July 2013)
  • JIMAH Fabricate Hydraulic Cylinder for Continuous Unloader loading Arm; (Completed) (Year Dec 2013)
  • TANJUNG BIN Supply SR & CUL Hinge Bearings; (Completed) (Year Feb 2014)
  • JIMAH Supply TSchan Elastic Coupling Normex; (Completed) (Year May 2014)
  • VALE Malaysia Minerals Project (via Beumer Maschinenfabrik Gmbh & Co Kg) Site Management & Commissioning of Beumer’s deliveries; (Completed) (Year Oct 2012 – Sept 2014)
  • JIMAH Supply SR Main Slew KTR Rotex; (Completed) (Year April 2015)
  • JIMAH Supply CUL Buckets 87 nos; (Completed) (Year June 2015)
  • JIMAH CHS CUL 2 Luffing Hydraulic Cylinder Replacement; (Completed) (Year Aug 2015)
  • JIMAH CHS Fabrication, Delivery, Supervision on Installation of Return Shaft & Accessories; (Completed) (Year September 2015)
  • JIMAH CHS Supply of Chain Guide Roller (CUL Suspension Roller); (Completed) (Year September 2015)
  • JIMAH CHS Inspection & Repair (Patching) CUL 2 BE Vertical Cylinder Tube; (Completed) (Year Dec 2015)
  • LBT Extension Phase 1A Technical Studies & Consultancy (via EastLog); (Completed) (Year Jan 2016)
  • TANJUNG BIN CUL 10 Bucket Elevator Shell Partial Replacement; (Completed) (Year Feb 2016)
  • EAST PORT INDONESIA Technical Studies (via EastLog); (Completed) (Year March 2016)
  • TANJUNG BIN CUL 20 Slew Bearing Replacement; (Completed) (Year April 2016)
  • CRESENT GEAR (Jimah) Supply Spherical Bearings; (Completed) (Year April 2016)
  • TANJUNG BIN CUL 20 Shell Partial Replacement; (Completed) (Year Feb 2016)
  • TANJUNG BIN Supply for Stacker Reclaimer & CUL Bearing & Hinge Articulation; (Completed) (Year August 2016)
  • JIMAH CHS Supply, Delivery & Installation of 1 Return Shaft with accessories for CUL20 ; (Completed) (Year August 2016)
  • TANJUNG BIN CUL 10 Slew Bearing Replacement; (Completed) (Year Sept 2016)
  • JIMAH CHS Bucket Elevator Tube Inspection & Repair CUL 1 (Completed) (Year December 2016)
  • LAFARGE Cement, Rawang (for FLS Gmbh) Inspection of Shale Reclaimer (Completed) (Year January 2017)
  • JIMAH O&M Performance of Inspections fort Stacker Reclaimers 1, 2 & 3 Slew Bearing System; (Completed)(January 2017)
  • JORF Lasfar (Morocco) (via FLSmidth Germany); Supervision of Mechanical Scope on Extension of Fertilizer Plant (Completed) (March 2014 – June 2017)
  • YTL Power Technical Consultancy for Tanjung Jati A (Coal & Ash Handling Plant Indonesia); (Completed) (April 2016 – Dec 2017)
  • JIMAH O&M Bucket Elevator Inspection & Repair of Continuous Ship Unloader 2; (Completed)(August 2017)
  • TNBJ Manjung Technical Assistance on Improvements of the Existing Yard Conveying Systems; (Completed) (TNBJ 1,2,3) (June – Sept 2016)
  • JIMAH O&M Supply of Chain Guidance Plates for Continuous Ship Unloaders; (Completed) (Oct 2017)
  • JIMAH O&M Supply of Fixed and Rotating Bushes for the Lantern Gears; (Completed) (Sept 2017)
  • JIMAH O&M Slew Bearing Inspection of Continuous Ship Unloader 1 & 2; (Completed) (Nov 2017)
  • JIMAH O&M Repair of Slew Bearing Continuous Ship Unloader 2, Gear Mesh & Drive Pinion Support Frame; (Completed)(Nov 2017)
  • TNBJ Manjung (Via IHI Power) Rail Alignment for BC3A & BC3B;(Completed) (May – Nov 2017 & January 2018)
  • JIMAH O&M Slew Bearing of Stacker Reclaimer 3 Inspection Works and Technical Advice; (Completed) (February 2018)
  • JIMAH O&M Install & Commission Inner Slew Bearing HV Bolt Replacement of Stacker Reclaimer 2; (Completed)(March 2018)
  • TANJUNG BIN O&M Supply, Install & Commission New Slew Bearing for Stacker Reclaimer C; (Completed) (April 2018)
  • JIMAH O&M Supply, Fabricate, Replace & Commission Cylinder Tube (Bucket Elevator) for Continuous Unloaders (CUL) 10 & 20 ; (Completed) (May 2018 – CUL 20 and August 2018 – CUL 10)
  • TANJUNG BIN O&M Fabricate & Supply/Deliver Conveyor Belt EP630 -1800mm BW x 4P x 8mm x 3mm Fire Resistant DIN K – 300mt; (Completed in November 2018)
  • TANJUNG BIN O&M Fabricate & Supply/Deliver Conveyor Belt EP800 -2000mm BW x 4P x 6mm x 3mm Fire Resistant DIN K – 500mt; (Completed in December 2018)
  • JIMAH O&M SDN BHD Boom Hoisting Hydraulic Cylinder Replacement Work for SR 1; (Completed in December 2018)
  • TANJUNG BIN O&M Fabricate & Supply/Deliver Conveyor Belt EP500 -1400mm BW x 4P x 6mm x 3mm Fire Resistant DIN K – 500mt; (Completed in February 2019)
  • ASEAN BINTULU FERTILIZER (Via Beumer Maschinenfabrik Gmbh &Co Kg) Project Execution and Commissioning for Rejuvenation and Increasing of Capacity of Conveying System, Reclaim & Loading Facilities (Completed in February 2019)
  • JIMAH O&M SDN BHD Supply of Cellasto Seal for CUL 2 Bearing Hinge No 5; (Completed in February 2019)
  • JIMAH O&M Supply & Deliver Rothe Erde Anti-Friction Slew Bearing; (Delivered June 2019)
  • TNB JANAMANJUNG (via TNB Remaco) Replacement of Slew Bearing for SR1 (Completed on 4th June 2019)
  • JIMAH O&M Replacement of Hinge No 5 CUL 20 (Completed on May 2019)
  • TANJUNG BIN O&M BHD CUL 10 Bucket Elevator Vertical Cylinder Shell Rectification Work; (Completed September 2019)
  • JIMAH O&M Install & Replace Boom Hoisting Hydraulic Cylinder of Continuous Ship Unloader (CUL) 1; (Completed November 2019)
  • TANJUNG BIN O&M BHD Fabricate & Supply Belt Conveyor EP800/4, 1800mm x 4 Ply x 5mm x 3mm DIN-K 2 Rolls of 200mt per roll; (Delivered in 31st Dec 2019)
  • TANJUNG BIN O&M BHD CUL 20 Bucket Elevator Vertical Cylinder Shell Rectification Work; (Completed March 2020)
  • ATTARAT O&M COMPANY JORDAN Technical Service for Plant Assessment of Shale Oil Handling (via YTL Power Bhd); (Completed April 2020)
  • TANJUNG BIN O&M BHD Fabricate & Supply Belt Conveyor EP630/4, 1200mm x 4 Ply x 6mm x 2mm DIN-K 2 Rolls of 200mt per roll; (Delivered on 14.04.2020)
  • TANJUNG BIN O&M BHD CUL Main Luffing Hydraulic Cylinder Retrofit/Reconditioning Works; (Completed June 2020)
  • TANJUNG BIN O&M BHD (TBOMB) Replacement of Slew Bearing on Stacker Reclaimer (SR) C; (Completed in June 2020 Wk 4)

OUR PROJECTS ON-GOING
(In Order Books)

  • BEUMER MASCHINENFABRIK GMBH & CO KG Local Agent for Permanent Establishment of Beumer’s presence in Malaysia; (Oct 2012 – to-date)
  • JIMAH O&M SDN BHD (JOM) Repair of Vertical Cylinder Tube Continous Ship Unloader (CUL) 10 & 20 From +0m to +7.4m ; (to commence in June 2020 Wk 3)
  • TNB JANAMANJUNG (via TNB Remaco) Supply of Stacker Reclaimer’s Slew Bearing for Spare (To be delivered in September 2020)